Expense Journal Created in X3 at time of Day End of Tills can we have these entries checked where do

Expense Journal Created in X3 at time of Day End of Tills can we have these entries checked where do


******* Internal*********
KB is for a very initial level of information / details that can be used to Relate and check mapping of Expense Journal account in Sage X3 against the till variance account in iVend

Incident: 

INC0041428 

Environment: 

iVend 6.6 Patch 7510

Problem Description:

Expense Journals are created and posted to the GL Account 250999 and 260006. CREUSR_0 is IVND.

Scenario:

Expense Journals are created and posted to the GL Account 250999 and 260006 with IVND user and showing site id K001.

Solution:


1) Checked on session the GL Accounts mention by client.

2) After that check the expense details in Sage3.

3) After that we have checked the iVend no in Till Variance detail table and found the source of this document. 

 

Symptoms:

​N/A.

Resolution/Work Around:

We found the source of these transactions in the iVend DB in the Till Varinace detail table and informed the same to client.

    • Related Articles

    • Till Mgmt and End of Day Processes in iVend Retail

      Master Till The first step is to create the Master Tills. Each till requires a unique master record to be defined and then from this the user can set up the reusable tills. Each master till is used to generate the tills for use at the POS each ...
    • Need to stop multiple time of End of Day

      Need to stop multiple time of End of Day Environment: iVend Retail: 6.6 Product Query: Need to limit EOD one at a time in a day. Resolution: To limit EOD one at a time in a day, please uncheck ‘’Allow Back Date At End Of Day Process” in Enterprise ...
    • Automatic End of Day done before schedule Time

      Environment: iVend 6.6 integrated With SAPB1 Problem Statement: Automatic End of Day was done before schedule Time Symptoms: NA Resolution/Work Around: The Time zone on cloud service/On Premises Windows settings should match with the Time zone ...
    • Error during end of day

      Environment: 6.5 update 6 Problem Statement: An error pops up when trying to perform the end of day activity. "Load failed. Criteria - NHibernate.Criterion.QueryOver'2[CXS.SubSystem.labor.LaborSession, CXS.SubSystem.Labor.laborSession]" Log Details: ...
    • How to setup Automatic End Of Day

      iVend Version: 6.6 Product Query: How to setup Automatic End Of Day. You can now schedule EOD to trigger Automatically . For this EndofDay event is required to be triggered on POS. This article will show the basic steps that need to configure ...